該当する計画の依存関係を Jira で設定する

このページでは、Jira Cloud Premium と Enterprise の一部としてのみ利用できる高度な計画機能について説明します。

このセクションで説明するプロセスは、Jira 管理者権限を持っているユーザーのみが行えます。

By default, dependencies in your plan treat all work item links as though they have the Blocks work item link type. In order to use custom work item links, they must be created and defined by an administrator.

これは 2 段階のプロセスです。

  1. Navigate to the Jira admin panel using the  icon in the upper right and select Work items.

  2. In the left hand sidebar, select Work item linking under Work item features

  3. Make sure that work item linking is set to ON. If it's not, select Activate to enable it.

  4. Once activated, you can edit the NameOutward description, and Inward description of an existing work item link by selecting Edit from the right column. Use Update to save your changes.

    1. To add a new link, define the name of your new work item link and the descriptions using the fields under the Add New Link Type header. Use Add to save it. 

Read more about work item linking.

2. 設定を該当する計画に適用する

  1. 右上の アイコンで Jira 管理パネルに移動して、[製品] を選択します。

  2. Go to Dependencies on the left side nav. Add a work item linking type using the dropdown menu, or remove it with the x that appears in the box. Use Swap on the right side to invert the dependent relationship. 

  3. [変更を保存] を選択します。

これらの変更は、インスタンス内のすべてのプランの依存関係に適用されます。 

You also have the option of deciding whether your plan uses concurrent or sequential dependencies. With Sequential dependencies selected, work items scheduled to the same sprint show as being off-track dependencies. Read more the differences between sequential and concurrent dependencies.

 